सलाम छ चीनलाई ! नेपाली सीमाको सुरक्षा गर्न ..नेपाल-भारत सिमानामा चिनियाँ टोली तैनाथ सिमामिचने भारतीयको भागाभाग (भिडियो)


सलाम छ चीनलाई ! नेपाली सीमाको सुरक्षा गर्न ..नेपाल-भारत सिमानामा चिनियाँ टोली तैनाथ सिमामिचने भारतीयको भागाभाग (भिडियो)

Dumak (Jhapa): Chinese team, Jhapa, has said that Premier KP Sharma Oli has arrived shortly before the Chinese visit. The team of Jhapa has started a preliminary survey of Jhapa and Morang in the first quarter of the survey. The seven-member Tali, which came down from Kathmandu to Kathmandu on Bhadrapur’s airport, has started work from the first phase of the work of Minister of State for Development, Oli and Mawa Opena, located on the western edge of the Hometown of Doha. This nine-year preliminary survey of nine rivers including Kanchi, Biring, Kamal, Sati, Ratanwa, Mawa Prime Minister of the Prime Minister who seeks a permanent solution to the border along with the river river open Thapa said, “The work has started from Rutva Opena. Nepal and India’s representatives have been working in close proximity to the border near India with the limits of the border. “China’s support for China’s support for the drought of various river river rivers and a sustainable solution to the problem of drought. The Chinese team has arrived at Jhapa on the same consensus basis. The team of representatives of China Communications Company in China has started to take information about the drought eradicated from the river rivers. Earlier, the Chinese team will begin an initial survey on the cutting edge, drown and drainage of river rivers in the first phase, due to the restrictions of such rivers and the need for restrictions on the problem and due to the opening due to the opening. Senior engineer Arvind Kumar Gupta of the Department of Management said that the detailed survey on the basis of the survey will be done and after which the project will produce detailed project report (DPR). He said that the work will be prepared after the initial survey of all the rivers opened in Jhala and Jharkhand, which was agreed to resolve the lasting problem during the visit of China. He said that the construction of permanent boundaries from 30 to 35 km Gupta informed. In such Jharka rivers, such type of dam will be constructed at a distance of 500 miles. So the dam will conserve the land, settlements and other structures of the river farmers in a sustainable manner .Justa is also included in the initial study of rivers along with the expectations of Chinese with Chinese. Representative of 4, LP Sunwa, Jhapa is expecting the land to grow in the hills of five thousand bighas after the construction of the dam and the ban on the Chinese side. Due to the fact that there is no definite ‘track’, the thousands of Bigha land is now as a bug. After the restrictions, the use of land of high-income land can be used. “This land can be used as well as construction of unified settlement and operating industrial sector by resolving the problem of scandalism,” he said. Rennathman Oli, the chairman of the Chinese team, informed that Chinese team reached various places of Dumak and took about the situation of Rukwa. He said that the ban on the damages caused by the river river was due to the damage caused by the river river, hoping to conserve hundreds of bigha land and habitat in Dumak. I know

Comments